Cangzhou Joint Stock Company Juhai Branch Status Evaluation

Time:2012-06-19
|
From:
|
Views:298
|
Font Size:Default Big Large
|
Print
|
1. Safety evaluation project name: Cangzhou Dahua joint stock company Juhai branch status evaluation
2. Safety evaluation project introduction: Cangzhou Dahua joint stock company Juhai Branch (hereinafter referred to as Juhai Branch) is a branch of Cangzhou Dahua joint stock company, established on February 24, 2009, mainly responsible for the implementation of the construction project of Cangzhou Dahua joint stock company in Cangzhou Bohai New Area Chemical Industry Park. The company has built 50,000 t/year TDI and 60,000 t/year DNT production equipment. The main product is TDI (toluene diisocyanate), and the by-product hydrochloric acid is a hazardous chemical manufacturer.
3. Safety evaluation project leader, technical leader, process control leader, evaluation report compiler, report auditor, safety evaluator, registered safety engineer, and technical expert involved in the evaluation:
  Safety evaluation project leader: Zhang Lijuan
  Technical person in charge: Cao Shuhua
  Person in charge of process control: Wang Lin
  Evaluation Report Compilers: Xu Zhe, Sun Guang, Yang Jiangming, Qiao Runhua
  Report Reviewer: Gao Weili
  Safety evaluators, registered safety engineers, and technical experts participating in the evaluation work: Zhang Lijuan, Xu Zhe, Sun Guang, Yang Jiangming, Qiao Runhua
4. List of personnel, time, and main tasks to carry out safety evaluation work on site, and evaluation report time:
 In March 2012, Cangzhou Dahua joint stock company Juhai Branch approached Hebei Huafei Technology Consulting Co., Ltd. to discuss the safety evaluation of its whole plant. Huafei Company appointed relevant personnel to go to the site of Juhai Branch in April 2012 to conduct on-site inspections, understand the main equipment, production scale, general layout, public works supply and surrounding relationships of the project, and collect relevant information on the project, and make relevant risk analysis of the project. After many conferrals, the relevant personnel of the two companies formed a preliminary intention and initially clarified the object and scope of the evaluation. During the evaluation process, the members of the evaluation team carefully analyzed and sorted out the relevant materials provided by the enterprise and collected on site, identified the dangerous and harmful factors existing in the project, conducted a qualitative and quantitative evaluation of the inherent danger degree of the project according to the divided evaluation units, and analyzed the risk degree of the project, put forward targeted safety countermeasures and suggestions, and exchanged views with the construction unit, and made a safety evaluation conclusion on this basis. After solid work, the safety status evaluation report was completed in May 2012.

Scan