1. Safety evaluation project name: Baoding Public Transport Corporation North Second Ring Bus Gas Station New Project Safety Facilities Completion Acceptance Evaluation Report
2. Introduction to the safety assessment project:
Baoding City Public Transport Corporation North Second Ring Bus Gas Station is located in Baoding City Hengxiang Peking University Street and North Second Ring Road on the east side of the intersection of North Road North, established in 2017, is a branch owned by the whole people, the person in charge of Liu Xilin, the existing staff of 8 people. Mainly engaged in two varieties of ethanol gasoline and diesel for vehicles. The project has 4 buried oil tanks, including 2 gasoline storage tanks, 2 diesel storage tanks, single tank volume is 30m3, with 4 refueling machines and 4 refueling machines, gas filling facilities storage cylinder group 6m3, compressor 2, drying and metering devices each set, the station is refueling and gas building website (this project only involves the refueling part), the level is two, gasoline facilities are equipped with oil and gas recovery system. The land area of the gas station is 3806.26 square meters, and the main building has a station building, which is a two-story building with a construction area of 347.6 square meters, a shed area of 624 square meters (half of the projected area of the shed), and a building area of 155 square meters for anti-seepage tank ponds.
According to the relevant regulations of the state and Hebei Province and the evaluation contract signed between Hebei Huafei Technology Consulting Co., Ltd. and Baoding Public Transport Corporation North Second Ring Bus Gas Station, the evaluation scope is the general layout, process facilities, public works and auxiliary facilities, surrounding environment and safety management of the refueling part of Baoding Public Transport Corporation North Second Ring Bus Gas Station.
3. Safety evaluation project leader, technical leader, process control leader, evaluation report compiler, report auditor, safety evaluator, registered safety engineer, and technical expert involved in the evaluation:
    Safety evaluation project leader: Wang Tongen
    Technical person in charge: Zhou Junhong
    Person in charge of process control: Wang Lin
    Compilers of the evaluation report: Wang Tongen, Sun Guang, Ma Junxing
    Report Reviewer: Gao Weili
    Safety evaluators, registered safety engineers, and technical experts participating in the evaluation work: Gao Weili, Sun Guang, Zhou Junhong, Wang Tongen, Ma Junxing, Wang Lin
4. List of personnel, time, and main tasks to carry out safety evaluation work on site, and evaluation report time:
  In April 2017, Huafei Company established a project evaluation team and officially launched the evaluation work. The evaluators communicated with the stationmaster of the North Second Ring Bus Gas Station of Baoding Public Transport Corporation many times to collect relevant information. They went to the site to follow up the investigation many times and grasp the first-hand information data at the first time. During the evaluation process, the members of the evaluation team carefully analyzed and sorted out the relevant materials provided by the company and collected on site. After solid and meticulous work, the completion and acceptance evaluation report of the safety facilities of this project was compiled in June 2017.