1. Safety evaluation project name: Baoding City, Xushui District, Dazhong Fueling Center, operating hazardous chemicals safety evaluation report
2. Introduction to the safety assessment project:
Xushui District Dazhong Fueling Center, founded in 1996, covers an area of 1333.3 square meters. It is a sole proprietorship enterprise. The person in charge is Qi Wenzhong, and there are 6 employees. It operates two varieties of gasoline and diesel, with 3 gasoline steel tanks and 3 diesel steel tanks, 6 refueling machines. The total volume of gasoline is 60m ³, and the total volume of diesel tanks is 60m ³. The scale belongs to the third-level gas station. The station has obtained the dangerous chemical business license handled by Baoding Safety Production Supervision and Administration Bureau on May 13, 2014. The registration number is Ji Baojing (A) [2014] 060162. The valid period is until April 5, 2017.
3. Safety evaluation project leader, technical leader, process control leader, evaluation report compiler, report auditor, safety evaluator, registered safety engineer, and technical expert involved in the evaluation:
    Safety evaluation project leader: Wang Tongen
    Technical person in charge: Zhou Junhong
    Person in charge of process control: Wang Lin
    Compilers of the evaluation report: Wang Tongen, Sun Guang, Ma Junxing
    Report Reviewer: Gao Weili
    Safety evaluators, registered safety engineers, and technical experts participating in the evaluation work: Wang Tongen, Sun Guang, Ma Junxinggao Wei Li, Zhou Junhong, Wang Lin
4. List of personnel, time, and main tasks to carry out safety evaluation work on site, and evaluation report time:
 Hebei Huafei Science and Technology Consulting Co., Ltd. was commissioned by the Dazhong Fueling Center in Xushui District to conduct a safety status evaluation of the gas station. Our company conducted an on-site inspection of the gas station, and verified the certificates, licenses and relevant materials provided by the station in accordance with relevant laws and regulations. It was confirmed that the station met the prerequisites for safety evaluation, and the next step of evaluation work could be carried out. The two parties reached an agreement on the cost, progress and scope of the safety evaluation of the gas station, and signed a safety evaluation contract. Huafei Company established an engineering evaluation team and officially launched the evaluation work. The relevant evaluators communicated with the technical personnel of the enterprise for many times and exchanged a lot of information. They went to the site many times to follow up and investigate the trial production situation, and first-hand information and data were obtained to compile and complete the safety evaluation report of this project.

Scan